Distribution Impact Studies as required by PDC for the connection of embedded generators
Includes load flow, short-circuit, protective device coordination, harmonic and power quality, and transient stability studies as needed
With continuing support until DU acceptance
50k/MW and 100k/inspection as needed
2 weeks lang ang kailangan pagkabigay ng single-line diagram!